AUT WG Precinct
Client: Fletcher Construction
Culham Engineering fabricated and erected the structural steel for Fletcher Construction’s AUT WG Precinct Project.
This was a complex build as design was not completed before erection had commenced, causing a multitude of difficulties that had to be overcome both to adhere to Health and Safety, schedules and other trades. The structural element of this building has been delivered in the timeframe demanded.