Facilities

Facilities

Culham Engineering’s industrial construction facilities range from extensive on-site workshops through to an uncontaminated shop facility for stainless steel fabrication, in-house coatings facility and over 10 hectares of laydown areas across our sites at the Whangarei base and Northport, Marsden Point.

Culham’s slipway is situated with direct access to Whangarei harbour and boasts a 400 tonne capacity with 3 metre draft berthage facilities and full containment disposal.

Find out more about our facilities

Back to top